Final | 2/16/2010 | 2/16/2010 | 2/16/2010 | P | PASS |
Daryl Spivey
|
|
|
Please call Jim with questions ###-#### Inspection requested from web by: Sonja Hankel Phone #: ###-####
|
Final | 1/6/2010 | 1/6/2010 | 1/6/2010 | P | FAIL |
Bill VanDegrift
|
|
|
This will be ready around 2:00. Please call Jim with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel still needs the high low drinking fountain.
|
Final | 12/18/2009 | 12/18/2009 | 12/18/2009 | P | PART |
Daryl Spivey
|
|
|
Please call Mark with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel need to install the correct drinking fountains...............ds
|
Final | 12/16/2009 | 12/17/2009 | 12/17/2009 | P | NR |
Daryl Spivey
|
|
|
This will be ready late pm. Please call Mark with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
Plumbing Rough-in | 10/22/2009 | 10/27/2009 | 10/27/2009 | A | PASS |
Daryl Spivey
|
|
|
Please call Gary with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel R/I complete..........ds
|
Plumbing Rough-in | 9/18/2009 | 9/21/2009 | 9/21/2009 | A | PART |
Eric Strole
|
|
|
This will be ready late am. Please call Gary with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel-all dwv pass, all inwall water pass
|
Roof Drains | 9/17/2009 | 9/18/2009 | 9/18/2009 | A | PASS |
Eric Strole
|
|
|
Please call Gary with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
Plumbing Rough-in | 9/17/2009 | 9/17/2009 | 9/17/2009 | P | PART |
Eric Strole
|
|
|
sections complete pass.
|
Plumbing Rough-in | 9/16/2009 | 9/17/2009 | 9/17/2009 | A | PART |
Eric Strole
|
|
|
Please call Gary with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel-sections of dwv & water pass.
|
Plumbing Rough-in | 9/1/2009 | 9/2/2009 | 9/2/2009 | A | PART |
Eric Strole
|
|
|
Please call Gary with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel-2 overflows west side pass.
|
Plumbing Rough-in | 8/18/2009 | 8/19/2009 | 8/19/2009 | P | PART |
Eric Strole
|
|
|
Please call Gary with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel-area a dwv pass, area a inwall water pass.
|
Plumbing Rough-in | 8/17/2009 | 8/18/2009 | 8/18/2009 | A | PART |
Eric Strole
|
|
|
This will be for a partial, and will be ready late am. Please call Gary with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel-dwv west side pass, inwall rough-in west side pass.
|
Groundwork | 7/20/2009 | 7/21/2009 | 7/21/2009 | A | PASS |
Daryl Spivey
|
|
|
|
Water and/or Sewer | 7/20/2009 | 7/20/2009 | 7/20/2009 | P | PART |
Eric Strole
|
|
|
This will be ready Noon. Please call Josh with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel-waterline stub into building & to first flange outside building pass.
|
PLM-Aging Inspection | 7/1/2009 | 7/1/2009 | 7/1/2009 | | PASS |
Daryl Spivey
|
|
|
wip
|
Groundwork | 4/30/2009 | 5/1/2009 | 5/1/2009 | A | PART |
Daryl Spivey
|
|
|
Mark Mansfield still have a bathroom group to do on ground work.............ds
|
Groundwork | 4/30/2009 | 4/30/2009 | 4/30/2009 | P | CANC |
Daryl Spivey
|
|
|
Mark reschedule for am..........ds
|
Groundwork | 4/29/2009 | 4/30/2009 | 4/30/2009 | A | FAIL |
Daryl Spivey
|
|
|
Please call Mark with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel test not holding...............ds
|
Groundwork | 4/6/2009 | 4/6/2009 | 4/6/2009 | P | PART |
Daryl Spivey
|
|
|
Mark Phone #: ###-#### main lines tested........more work to be done on branch drains............ds
|