Final | 7/1/2009 | 7/1/2009 | 7/1/2009 | P | PASS |
Daryl Spivey
|
|
|
Randy-please call prior to inspection Phone #: ###-####
|
Plumbing Rough-in | 6/9/2009 | 6/10/2009 | 6/10/2009 | P | PART |
Daryl Spivey
|
|
|
Randy Holmes
|
Plumbing Rough-in | 6/9/2009 | 6/9/2009 | 6/9/2009 | P | NR |
Daryl Spivey
|
|
|
Randy Phone #: ###-####
|
Final | 6/3/2009 | 6/4/2009 | 6/4/2009 | A | PART |
Daryl Spivey
|
|
|
On one Bathroom and kitchen only Phone #: ###-####
|
Water and/or Sewer | 5/12/2009 | 5/12/2009 | 5/12/2009 | P | CANC |
Daryl Spivey
|
|
|
Randy- call 30 mins prior to going Phone #: ###-#### water service ok to bury.....need dcva for sprinkler tested.............ds
|
Plumbing Rough-in | 5/12/2009 | 5/12/2009 | 5/12/2009 | P | CANC |
Daryl Spivey
|
|
|
randy Phone #: ###-####
|
Groundwork | 5/12/2009 | 5/12/2009 | 5/12/2009 | P | PASS |
Daryl Spivey
|
|
|
randy Phone #: ###-####
|
Other | 4/22/2009 | 4/22/2009 | 4/22/2009 | A | PASS |
Daryl Spivey
|
|
|
conference on back bath remodel.......existing plumbing not installed per code or with a permit................ds
|
Plumbing Rough-in | 4/10/2009 | 4/14/2009 | 4/14/2009 | A | PART |
Daryl Spivey
|
|
|
randy Phone #: ###-#### kitchen and washer ok........ds
|
Plumbing Rough-in | 4/6/2009 | 4/6/2009 | 4/6/2009 | P | PART |
Daryl Spivey
|
|
|
Randy- call 30 mins prior to going Phone #: ###-#### good to cover bathroom wall.........ds
|