Final | 6/24/2009 | 6/25/2009 | 6/25/2009 | A | PASS |
Bill VanDegrift
|
|
|
|
Final | 6/24/2009 | 6/24/2009 | 6/24/2009 | P | CANC |
Bill VanDegrift
|
|
|
|
Final | 6/23/2009 | 6/24/2009 | 6/24/2009 | A | CANC |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 6/23/2009 at 10:34:26 PM. Contact: ###-####. loop dish washer drain to counter top height and secure, provide an airgap at the water softener drain termination.
|
Plumbing Rough-in | 4/29/2009 | 4/29/2009 | 4/29/2009 | P | PASS |
Bill VanDegrift
|
|
|
reinspection ri ok
|
Plumbing Rough-in | 4/29/2009 | 4/29/2009 | 4/29/2009 | A | FAIL |
Bill VanDegrift
|
|
|
still leaking
|
Plumbing Rough-in | 4/28/2009 | 4/29/2009 | 4/29/2009 | A | FAIL |
Bill VanDegrift
|
|
|
Mike Phone #: ###-#### nail plate washer box waste arm. waste test failed, two leaks, west bathroom, closet flange and downstream joint on 3" cleanout same area.
|