Final | 9/10/2009 | 9/11/2009 | 9/11/2009 | A | PASS |
Eric Strole
|
|
|
|
Final | 9/3/2009 | 9/3/2009 | 9/3/2009 | P | PART |
Eric Strole
|
|
|
Please call Steve with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel-need to protect waterlines outside at fueling station from freezing, extend outside vent & label all non-potable waterlines. temp final ok.
|
Water and/or Sewer | 8/28/2009 | 8/31/2009 | 8/31/2009 | A | PASS |
Eric Strole
|
|
|
test on interceptor pass, previous inspection notes for vent was under wrong permit.
|
Water and/or Sewer | 8/27/2009 | 8/28/2009 | 8/28/2009 | P | FAIL |
Eric Strole
|
|
|
interceptor needs 24 hr test without filling with more water.
|
Water and/or Sewer | 8/27/2009 | 8/27/2009 | 8/27/2009 | P | PART |
Eric Strole
|
|
|
start 24 hr test on interceptors. need test port & cleanout on downstream side of outside interceptor & install baffle on discharge side of east side interceptor.
|
Groundwork | 7/31/2009 | 7/31/2009 | 7/31/2009 | P | PART |
Eric Strole
|
|
|
Please call Steve with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel-fuel interceptors have been repiped, still need 24 hr test on interceptor on south side.
|
Final | 7/30/2009 | 7/31/2009 | 7/31/2009 | A | CANC |
Eric Strole
|
|
|
This is for a partial final in the main office and the dry goods areas. Please call Steve with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel-MAIN OFFICE -WRONG PERMIT
|
Plumbing Rough-in | 7/30/2009 | 7/30/2009 | 7/30/2009 | P | PART |
Eric Strole
|
|
|
Please call Steve with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel-water & sanitary portion of rough-in pass, need to pipe fuel interceptors as per plans and city approved drawing.need a rpba on water supply to hosebibs serving canopy.
|
Plumbing Rough-in | 7/28/2009 | 7/29/2009 | 7/29/2009 | A | FAIL |
Eric Strole
|
|
|
Please call Steve with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel-need to equal 3" on cross sectional venting, missing few nailplates & need mission couplings from pvc to cast iron.
|
Groundwork | 6/30/2009 | 6/30/2009 | 6/30/2009 | P | PASS |
Daryl Spivey
|
|
|
|
Groundwork | 6/25/2009 | 6/26/2009 | 6/26/2009 | A | PART |
Bill VanDegrift
|
|
|
Please call Steve with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel test ok on piping upstream of the interceptor at the fuel containment and downstream of the interceptor at the truck maintenance building.
|
Groundwork | 6/24/2009 | 6/24/2009 | 6/24/2009 | A | PART |
Bill VanDegrift
|
|
|
discharge side of the storndrain interceptor from fuel containment test ok
|