Final | 10/5/2010 | 10/6/2010 | 10/6/2010 | P | PASS |
Daryl Spivey
|
|
|
###-#### Kristina please call before going out Phone #: ###-####
|
PLM-Aging Inspection | 10/5/2010 | 10/5/2010 | 10/5/2010 | | PASS |
Daryl Spivey
|
|
|
talked with owner and will call in soon.......ds
|
Final | 8/4/2010 | 8/5/2010 | 8/5/2010 | A | PART |
Daryl Spivey
|
|
|
Kristina Phone #: ###-#### need to install water heater pan and run T&Pand pan drain outside...............ds
|
PLM-Aging Inspection | 7/30/2010 | 7/30/2010 | 8/3/2010 | | PASS |
Daryl Spivey
|
|
|
stopped and talked to Nathan. He will call in next week.........ds
|
PLM-Aging Inspection | 5/6/2010 | 5/6/2010 | 5/6/2010 | | PASS |
Daryl Spivey
|
|
|
wip
|
PLM-Aging Inspection | 2/19/2010 | 2/19/2010 | 2/19/2010 | | PASS |
Daryl Spivey
|
|
|
wip
|
Plumbing Rough-in | 10/19/2009 | 10/21/2009 | 10/21/2009 | P | PASS |
Daryl Spivey
|
|
|
nathan Phone #: ###-####
|
Plumbing Rough-in | 10/9/2009 | 10/12/2009 | 10/12/2009 | P | FAIL |
Daryl Spivey
|
|
|
Nathon Phone #: ###-#### waste and vent test failed with several leaks.........ds
|
Plumbing Rough-in | 10/6/2009 | 10/7/2009 | 10/7/2009 | P | PART |
Daryl Spivey
|
|
|
Nathan Phone #: ###-#### water ok..............need test on W/V........and fix back graded vents..............ds
|
Other | 9/29/2009 | 9/30/2009 | 9/30/2009 | P | PASS |
Daryl Spivey
|
|
|
nathan - conference Phone #: ###-#### notified that another trip will result in reinspection fee for R/I...........ds
|
Other | 9/21/2009 | 9/22/2009 | 9/22/2009 | A | PASS |
Daryl Spivey
|
|
|
Nathan Lawson Phone #: ###-#### conference only............ds
|
Plumbing Rough-in | 9/11/2009 | 9/14/2009 | 9/14/2009 | P | FAIL |
Daryl Spivey
|
|
|
kristina Phone #: ###-#### need to support all plumbing with approved material, repipe waste and vent to code, repipe water from galv. to copper with approved transition and test.........ds
|
Other | 8/26/2009 | 8/28/2009 | 8/28/2009 | P | PASS |
Daryl Spivey
|
|
|
Christina Phone #: ###-#### conference with owners on plumbing.........ds
|