Final | 9/29/2009 | 9/29/2009 | 9/29/2009 | P | PASS |
Jim Johnson
|
|
|
Phone #: ###-#### Internet Inspection Request from: Erin Whiting
|
Plumbing Rough-in | 8/21/2009 | 8/24/2009 | 8/24/2009 | A | PASS |
Jim Johnson
|
|
|
Phone #: ###-#### Internet Inspection Request from: Erin Whiting
|
Plumbing Rough-in | 8/20/2009 | 8/21/2009 | 8/21/2009 | A | FAIL |
Jim Johnson
|
|
|
Phone #: ###-#### Internet Inspection Request from: Erin Whiting need to pipe discharge from ejector to 4 inch building drain upc table 7-5 need to provide vent and water stub,s to future fixtures in basement upc 419.0 contractor to recall when ready
|
Groundwork | 8/5/2009 | 8/6/2009 | 8/6/2009 | A | PASS |
Jim Johnson
|
|
|
Phone #: ###-#### Internet Inspection Request from: Erin Whiting
|