Final | 9/11/2009 | 9/11/2009 | 9/11/2009 | P | PASS |
Daryl Spivey
|
|
|
Joel Phone #: ###-#### all water connections as noted are protected and backflows installed and tested......ds
|
Final | 9/2/2009 | 9/3/2009 | 9/3/2009 | P | PART |
Daryl Spivey
|
|
|
Joel bakery area done....need other backflow issues in store taken care of ( list given to contractor and plumber) before final is complete....temp occ is ok........ds
|
Final | 9/2/2009 | 9/2/2009 | 9/2/2009 | P | PART |
Daryl Spivey
|
|
|
joel Phone #: ###-#### need backflows tested.........ds
|
Water and/or Sewer | 9/2/2009 | 9/3/2009 | 9/2/2009 | P | CANC |
Daryl Spivey
|
|
|
|
Final | 9/1/2009 | 9/1/2009 | 9/1/2009 | P | FAIL |
Daryl Spivey
|
|
|
joel Phone #: ###-#### need backflow protection as required on equipment by united water..........ds
|
Plumbing Rough-in | 8/20/2009 | 8/21/2009 | 8/21/2009 | A | PART |
Daryl Spivey
|
|
|
joel Phone #: ###-#### 2 vents to run after walls are built..........ds
|
Plumbing Rough-in | 8/19/2009 | 8/19/2009 | 8/19/2009 | P | CANC |
Daryl Spivey
|
|
|
john - underground - early afternoon please Phone #: ###-####
|
Groundwork | 8/19/2009 | 8/19/2009 | 8/19/2009 | P | PASS |
Daryl Spivey
|
|
|
john - underground - early afternoon please Phone #: ###-####
|
Other | 8/18/2009 | 8/18/2009 | 8/18/2009 | P | PASS |
Daryl Spivey
|
|
|
john - please call 1/2 hr prior - conference Phone #: ###-####
|