Water and/or Sewer | 9/29/2009 | 9/30/2009 | 9/30/2009 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 9/29/2009 at 5:18:55 PM. Contact: ###-####.
|
Final | 9/30/2009 | 9/30/2009 | 9/30/2009 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 9/29/2009 at 5:18:55 PM. Contact: ###-####.
|
Water and/or Sewer | 9/28/2009 | 9/28/2009 | 9/28/2009 | P | PART |
Bill VanDegrift
|
|
|
lynn Phone #: ###-#### ok to cover service through the parking lot, there is a leak at the sprinkler connection, will leave open and the building dcva and sprinkler dcva need testing.
|