Final | 11/9/2009 | 11/9/2009 | 11/9/2009 | A | PASS |
Daryl Spivey
|
|
|
|
Water and/or Sewer | 11/6/2009 | 11/9/2009 | 11/9/2009 | A | CANC |
Daryl Spivey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Erin Whiting
|
Final | 11/2/2009 | 11/2/2009 | 11/2/2009 | P | PART |
Daryl Spivey
|
|
|
1:30 pm Ed ###-#### sink to be anchored, floor sink needs vent ran and install air vent in grease line as manufacture requires.................ds
|
Water and/or Sewer | 10/30/2009 | 11/2/2009 | 11/2/2009 | A | CANC |
Daryl Spivey
|
|
|
Ed Davis is your contact. Phone #: ###-#### Internet Inspection Request from: Erin Whiting
|
Final | 11/2/2009 | 11/2/2009 | 11/2/2009 | A | FAIL |
Daryl Spivey
|
|
|
Ed Davis is your contact. Phone #: ###-#### Internet Inspection Request from: Erin Whiting grease interceptor not installed to manufacturer's requirements and cannot use green transition glue inside of building, and floor sink needs replumbed to code................ds
|