Final | 4/7/2010 | 4/7/2010 | 4/7/2010 | A | PASS |
Bill VanDegrift
|
|
|
final ok
|
Other | 3/30/2010 | 3/31/2010 | 3/31/2010 | A | PART |
Bill VanDegrift
|
|
|
1:00 meet bill thompson walk through with bill need to lower rp's for the chem equipment general walk through ok 1hr 30 min.
|
Final | 3/30/2010 | 3/30/2010 | 3/30/2010 | P | PART |
Bill VanDegrift
|
|
|
need water ran to rp's for the chem system, rp's tested, seal around the condensate drain by the restrooms. 1 hr.
|
Plumbing Rough-in | 3/29/2010 | 3/29/2010 | 3/29/2010 | P | PASS |
Bill VanDegrift
|
|
|
stainless venting complete
|
Plumbing Rough-in | 3/25/2010 | 3/25/2010 | 3/25/2010 | P | PART |
Bill VanDegrift
|
|
|
just needs west end vents
|
Plumbing Rough-in | 3/25/2010 | 3/25/2010 | 3/25/2010 | P | PART |
Bill VanDegrift
|
|
|
stainless venting test, east side ok.
|
Plumbing Rough-in | 3/24/2010 | 3/24/2010 | 3/24/2010 | A | PART |
Bill VanDegrift
|
|
|
talked about testing vent in production area
|
Final | 3/9/2010 | 3/9/2010 | 3/9/2010 | A | PART |
Bill VanDegrift
|
|
|
restrooms temp occ ok 1 hr
|
Water and/or Sewer | 2/3/2010 | 2/3/2010 | 2/3/2010 | P | PART |
Bill VanDegrift
|
|
|
restrooms ri ok
|
Roof Drains | 1/28/2010 | 1/28/2010 | 1/28/2010 | A | PART |
Bill VanDegrift
|
|
|
interior rain drains test ok 90 min.
|
Groundwork | 1/15/2010 | 1/15/2010 | 1/15/2010 | P | PART |
Bill VanDegrift
|
|
|
3 runs acrss drive ok 25 min.
|
Groundwork | 1/15/2010 | 1/15/2010 | 1/15/2010 | A | PART |
Bill VanDegrift
|
|
|
restroom and small section just behind restroom ok 30 min.
|
Groundwork | 1/13/2010 | 1/13/2010 | 1/13/2010 | A | PART |
Bill VanDegrift
|
|
|
trap in drive access ok 25min.
|
Groundwork | 1/11/2010 | 1/11/2010 | 1/11/2010 | A | PART |
Bill VanDegrift
|
|
|
6" branch north across drive access 20 min.
|
Groundwork | 1/8/2010 | 1/8/2010 | 1/8/2010 | P | PART |
Bill VanDegrift
|
|
|
last of the 6" mainline
|
Groundwork | 1/6/2010 | 1/6/2010 | 1/6/2010 | A | PART |
Bill VanDegrift
|
|
|
next section east ok
|
Groundwork | 1/5/2010 | 1/5/2010 | 1/5/2010 | A | PART |
Bill VanDegrift
|
|
|
first branch waste line east of tie in to existing test ok 40 min.
|
Water and/or Sewer | 12/21/2009 | 12/21/2009 | 12/21/2009 | P | PASS |
Bill VanDegrift
|
|
|
this was for the tie in to the new manhole by the new tank. 30 min.
|
Groundwork | 11/30/2009 | 11/30/2009 | 11/30/2009 | P | PART |
Bill VanDegrift
|
|
|
main line gw bulkhead to bulkhead test ok 25 min.
|
Groundwork | 11/30/2009 | 11/30/2009 | 11/30/2009 | A | PART |
Bill VanDegrift
|
|
|
south branch ok 40 min.
|
Groundwork | 11/25/2009 | 11/25/2009 | 11/25/2009 | P | FAIL |
Bill VanDegrift
|
|
|
leaky 30 min.
|
Groundwork | 11/24/2009 | 11/24/2009 | 11/24/2009 | P | PART |
Bill VanDegrift
|
|
|
two floor drains production area north side. 45 min.
|
Groundwork | 11/20/2009 | 11/21/2009 | 11/21/2009 | A | PART |
Bill VanDegrift
|
|
|
8x6 tie in to existing ok 2hrs
|
Groundwork | 11/19/2009 | 11/19/2009 | 11/19/2009 | A | PART |
Bill VanDegrift
|
|
|
gw for drains in west laoding dock and tie in to existing ok, relocated rain drain stub out west loading dock ok. 1 hr.
|
Groundwork | 11/18/2009 | 11/18/2009 | 11/18/2009 | P | NR |
Bill VanDegrift
|
|
|
called to inspect 8x6 tie in but the 8" was an abandoned line. 45 min.
|
Groundwork | 11/18/2009 | 11/18/2009 | 11/18/2009 | A | PART |
Bill VanDegrift
|
|
|
conference on the 8x6 connection and its relocation due to existing abandoned vault in that location. 45 min.
|
Groundwork | 11/17/2009 | 11/17/2009 | 11/17/2009 | A | PART |
Bill VanDegrift
|
|
|
roof drain stubout test east side loading dock ok 15 min.
|
Groundwork | 11/16/2009 | 11/17/2009 | 11/17/2009 | A | PART |
Bill VanDegrift
|
|
|
east trench drain in the loading dock nw corner of the project ok. test on the fabed 8x6 wye ok. 1hr.
|
Groundwork | 11/13/2009 | 11/13/2009 | 11/13/2009 | A | PART |
Bill VanDegrift
|
|
|
meeting ok 1 hour partial gw ok last rain drain east side ok 45 min.
|
Plumbing Rough-in | 11/3/2009 | 11/4/2009 | 11/4/2009 | A | PART |
Bill VanDegrift
|
|
|
PLUMBING ROUGH FOR STORM DRAINS - CALL CORY TO SCHEDULE ###-#### Phone #: ###-#### Internet Inspection Request from: Allison Briggs four storm drain stubouts east side ok. 1-hr
|