Final | 2/4/2010 | 2/4/2010 | 2/4/2010 | A | PASS |
Daryl Spivey
|
|
|
completed sewer and water lines...........ds
|
Plumbing Rough-in | 2/3/2010 | 2/4/2010 | 2/4/2010 | A | CANC |
Daryl Spivey
|
|
|
Rob Phone #: ###-####
|
Water and/or Sewer | 2/4/2010 | 2/4/2010 | 2/4/2010 | A | PASS |
Daryl Spivey
|
|
|
Rob Phone #: ###-####
|
Water and/or Sewer | 1/20/2010 | 1/20/2010 | 1/20/2010 | P | PART |
Daryl Spivey
|
|
|
We are stubbing the utilities down the long drive to the lot so we can start building the road. We will hook up to the house at a later time. If you have any questions please give Dave Wood a call on his cell @ ###-####. Thanks! Phone #: ###-#### Internet Inspection Request from: Dave Wood drive way section in and tested...........ds
|
Water and/or Sewer | 1/19/2010 | 1/20/2010 | 1/20/2010 | A | CANC |
Daryl Spivey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Dave Wood Inspection cancelled from web by: Dave Wood
|