Final | 3/10/2010 | 3/10/2010 | 3/10/2010 | A | PASS |
Bill VanDegrift
|
|
|
|
Final | 3/5/2010 | 3/5/2010 | 3/5/2010 | A | PART |
Bill VanDegrift
|
|
|
verifier passed just needs report finalized temp occ ok
|
Final | 3/3/2010 | 3/3/2010 | 3/3/2010 | P | FAIL |
Bill VanDegrift
|
|
|
Bo Phone #: ###-#### provide system verification report. provide approved plans.
|
Plumbing Rough-in | 2/4/2010 | 2/5/2010 | 2/5/2010 | P | FAIL |
Bill VanDegrift
|
|
|
job will be on test ready at 12pm. Thanks, Boe Phone #: ###-#### Internet Inspection Request from: Boe Jares work has been preforned outside of the scope of the building permit. exam sinks, break sink, dental air and vac system, floor sink, etc. contact plan reviewer at PDS department about plan modification. waste line to floor sink looks backgraded.
|