Final | 12/8/2010 | 12/8/2010 | 12/8/2010 | P | PASS |
Jim Johnson
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kristy Watson
|
Final | 12/7/2010 | 12/7/2010 | 12/7/2010 | P | PART |
Jim Johnson
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kristy Watson need to anchor water piping to water heater turn T&Pdrain valve down with 90 degree elbow and pan drain on south side of building contractor to recall when ready
|
PLM-Aging Inspection | 10/14/2010 | 10/14/2010 | 10/14/2010 | | PASS |
Jim Johnson
|
|
|
under construction
|
Plumbing Rough-in | 5/27/2010 | 5/27/2010 | 5/27/2010 | A | PASS |
Jim Johnson
|
|
|
Inspection requested from web by: Kristy Watson Phone #: ###-####
|