Final | 4/9/2010 | 4/9/2010 | 4/9/2010 | P | PASS |
Jim Johnson
|
|
|
Phone #: ###-####
|
Final | 3/27/2010 | 3/29/2010 | 3/29/2010 | A | PART |
Jim Johnson
|
|
|
Inspection requested from web by: bob pond Phone #: ###-#### need to adjust lav faucet for 120 degree hot water limitation. need to correct leak in drinking fountain. need to find main water supply to space may need to install premius protection if needed . contractor to verify. contractor to recall when ready
|
Plumbing Rough-in | 3/10/2010 | 3/10/2010 | 3/10/2010 | P | PASS |
Jim Johnson
|
|
|
will call jim when ready for inspection, thanks bob pond Inspection requested from web by: bob pond Phone #: ###-####
|