Final | 4/29/2010 | 4/30/2010 | 4/30/2010 | A | PASS |
Jim Johnson
|
|
|
RP installed on soda machine and tested all other equipment is approved and installed Inspection requested from web by: Jason Gale Phone #: ###-####
|
Final | 4/28/2010 | 4/28/2010 | 4/28/2010 | P | NR |
Jim Johnson
|
|
|
Should be ready for you around 11 A.M., I think the Plumber doing the bathrooms was calling his in for today also, you could prob get them at the same time. Thanks, Gale Plumbing Inc. Inspection requested from web by: Jason Gale Phone #: ###-####need to have all water supplied equipment installed may need additional backflow for coffee maker steam unit and ice maker need rp installed on soda tower contractor to recall when ready
|
Plumbing Rough-in | 3/22/2010 | 3/22/2010 | 3/22/2010 | A | PASS |
Jim Johnson
|
|
|
Waste was inspected previously by others, this is for the water lines. Inspection requested from web by: Jason Gale Phone #: ###-####
|