Plumbing Rough-in | 11/10/2010 | 11/12/2010 | 11/12/2010 | A | PASS |
Jim Johnson
|
|
|
Kurt ###-####//Kurt is the general contractor and said cannot contact 8 West, they did the work and stopped at r/i stage so if this r/i passes need to close out permit by NOTE FINAL FOR GROUND -WORK ONLY
|
DOC - Permit Finaled | 11/12/2010 | 11/12/2010 | 11/12/2010 | A | PASS |
Jim Johnson
|
|
|
Kurt ###-####//Kurt is the general contractor and said cannot contact 8 West, they did the work and stopped at r/i stage so if this r/i passes need to close out permit by doc-expiring. final on ground-work only JEJ
|
PLM-Aging Inspection | 10/25/2010 | 10/25/2010 | 10/25/2010 | | PASS |
Jim Johnson
|
|
|
|
PLM-Aging Inspection | 8/23/2010 | 8/23/2010 | 8/23/2010 | | PASS |
Jim Johnson
|
|
|
|
PLM-Aging Inspection | 6/21/2010 | 6/21/2010 | 6/21/2010 | | PASS |
Jim Johnson
|
|
|
no request for rough-in inspection
|
Groundwork | 4/19/2010 | 4/19/2010 | 4/19/2010 | P | PASS |
Jim Johnson
|
|
|
Troy Phone #: ###-####
|
Plumbing Rough-in | 4/16/2010 | 4/16/2010 | 4/16/2010 | P | PART |
Jim Johnson
|
|
|
Troy please call 30 min before going out Phone #: ###-#### plumbing contractor need to adjust permit to correspond to ground work installed need to replace 3/4 water line to 1 1/4 min. contractor to recall when ready
|