Final | 8/10/2010 | 8/10/2010 | 8/10/2010 | P | PASS |
Jim Johnson
|
|
|
Anthony Phone #: ###-####
|
Final | 8/9/2010 | 8/9/2010 | 8/9/2010 | P | FAIL |
Jim Johnson
|
|
|
Anthony-please call for access information Phone #: ###-#### need to repipe T&P drain line with approved matierial and in an approved method talked to contractor will recall when ready
|
Plumbing Rough-in | 6/16/2010 | 6/17/2010 | 6/17/2010 | A | PART |
Jim Johnson
|
|
|
Anthony Phone #: ###-#### rough-in test ok talked to plumbing contractor and told him that before rough-in could be passed a building permit would be required
|