Final | 7/30/2010 | 7/30/2010 | 7/30/2010 | A | PASS |
Bill VanDegrift
|
|
|
drinking fountain was deleted by plan review, hose bib deleted by owner, thermol expansion is covered elsewere in the building for the 3 gallon water heater. final vinalla shell ok.
|
Final | 7/29/2010 | 7/29/2010 | 7/29/2010 | P | FAIL |
Bill VanDegrift
|
|
|
provide drinking fountain and front hose bib per vinalla finish plans or remove them from the scope of work. The water heater was to be set on the T.I. work, provide a thermol expansion tank.
|
Final | 7/29/2010 | 7/29/2010 | 7/29/2010 | P | NH |
Bill VanDegrift
|
|
|
ken Phone #: ###-#### no access left notice
|
Plumbing Rough-in | 7/12/2010 | 7/13/2010 | 7/13/2010 | A | PASS |
Jim Johnson
|
|
|
ken Phone #: ###-####
|
Groundwork | 7/6/2010 | 7/7/2010 | 7/7/2010 | A | PASS |
Jim Johnson
|
|
|
ken Phone #: ###-#### note restroom area D W V ground work test ok ok to cover still need to make provision for drinking fountain as per conversation with plumbing contractor
|