Final | 8/27/2010 | 8/27/2010 | 8/27/2010 | P | PASS |
Bill VanDegrift
|
|
|
final ok
|
Final | 8/27/2010 | 8/27/2010 | 8/27/2010 | A | FAIL |
Bill VanDegrift
|
|
|
Thanks - Jim ###-#### >> Inspection requested via web by James Romano needs air gaps and seperete drains for the ice bins.
|
Plumbing Rough-in | 8/12/2010 | 8/13/2010 | 8/13/2010 | A | PASS |
Bill VanDegrift
|
|
|
jim Phone #: ###-#### ri ok just moved the lav waste to allow clearance for the electrical panel.
|
Plumbing Rough-in | 8/11/2010 | 8/11/2010 | 8/11/2010 | A | PASS |
Bill VanDegrift
|
|
|
Thanks - ###-#### Jim >> Inspection requested via web by James Romano ri ok
|
Groundwork | 8/3/2010 | 8/4/2010 | 8/4/2010 | A | PASS |
Daryl Spivey
|
|
|
Thanks, Jim ###-#### >> Inspection requested via web by James Romano
|