Final | 4/12/2011 | 4/13/2011 | 4/13/2011 | A | PASS |
Jim Johnson
|
|
|
|
Final | 4/11/2011 | 4/12/2011 | 4/12/2011 | A | PART |
Jim Johnson
|
|
|
JOB CONTACT IS AB JENSEN Phone #: ###-#### >> Inspection requested via web by ADAM WARR need premise protection tested and certified for final
|
PLM-Aging Inspection | 3/28/2011 | 3/28/2011 | 3/28/2011 | | PASS |
Jim Johnson
|
|
|
|
Plumbing Rough-in | 1/21/2011 | 1/24/2011 | 1/24/2011 | A | PASS |
Jim Johnson
|
|
|
CONTACT IS AB ###-#### Phone #: ###-#### >> Inspection requested via web by LENNIE BUSS
|
Plumbing Rough-in | 1/21/2011 | 1/21/2011 | 1/21/2011 | P | FAIL |
Jim Johnson
|
|
|
CONTACT IS AB ###-#### Phone #: ###-#### >> Inspection requested via web by LENNIE BUSS test failed on D W V and water
|
Groundwork | 11/30/2010 | 12/1/2010 | 12/1/2010 | P | PART |
Jim Johnson
|
|
|
Contact is Ab: ###-#### Phone #: ###-#### >> Inspection requested via web by Kara Tillman vent,s and discharge line for elevator sump drain test ok
|
Plumbing Rough-in | 11/29/2010 | 11/30/2010 | 11/30/2010 | A | PART |
Jim Johnson
|
|
|
CONTACT IS AB ###-#### Phone #: ###-#### >> Inspection requested via web by LENNIE BUSS ground floor rough-in on D W V and water test ok ok to cover still need to rough in second floor
|
Groundwork | 11/15/2010 | 11/16/2010 | 11/16/2010 | P | PART |
Jim Johnson
|
|
|
two inch copper water stub test ok ok to cover
|
Groundwork | 11/12/2010 | 11/15/2010 | 11/15/2010 | P | NR |
Jim Johnson
|
|
|
Contact name: Ab Jensen Phone #: ###-#### >> Inspection requested via web by Kara Tillman test on main water service not ready
|
Plumbing Rough-in | 11/4/2010 | 11/4/2010 | 11/4/2010 | P | PART |
Bill VanDegrift
|
|
|
ok to insulate water lines, leak at the base of the 4" stack, lav, and needs to install a 4" S.S. 1/4 bend at horizontal to horizontal offset above the restroom.
|