Final | 11/1/2010 | 11/1/2010 | 11/1/2010 | P | PASS |
Jim Johnson
|
|
|
Phone #: ###-#### >> Inspection requested via web by Frank Young
|
Final | 10/26/2010 | 10/27/2010 | 10/27/2010 | A | PART |
Jim Johnson
|
|
|
Norco should have there inspection report any day to give to you Phone #: ###-#### >> Inspection requested via web by Frank Young need system verification report for final contractor to recall when ready
|
Med/Gas Systems | 9/21/2010 | 9/22/2010 | 9/22/2010 | A | PASS |
Jim Johnson
|
|
|
received an approved set of plan,s for new med gas system rough-in on med gas ok ok to cover
|
Other | 9/20/2010 | 9/20/2010 | 9/20/2010 | A | FAIL |
Bill VanDegrift
|
|
|
recieved resubmitted dental gas and vacuum plans, need to show all inlet and outlets installed in the system.
|
Other | 9/16/2010 | 9/16/2010 | 9/17/2010 | P | FAIL |
Bill VanDegrift
|
|
|
met JIm J. went over the job, needs a dental gas plan prior to rough in approval.
|
Med/Gas Systems | 9/15/2010 | 9/16/2010 | 9/16/2010 | P | PART |
Jim Johnson
|
|
|
a new med-gas system has been installed need to submit a med-gas plan for approval as noted on plumbing review notes on approved set of plans on site. note- 24hr pressure test on system installed test ok test ok.
|
Plumbing Rough-in | 9/15/2010 | 9/15/2010 | 9/15/2010 | P | PART |
Jim Johnson
|
|
|
medical gas inspection Phone #: ###-#### >> Inspection requested via web by Frank Young start of 24 hr. pressure test
|