Final | 10/5/2010 | 10/5/2010 | 10/5/2010 | P | PASS |
Bill VanDegrift
|
|
|
Adam ###-#### - call 30 mins prior to going to meet
|
Final | 10/1/2010 | 10/4/2010 | 10/4/2010 | A | FAIL |
Bill VanDegrift
|
|
|
Adam ###-#### needs new trap at master lavs. valve at water heater needs to be upstream of flex.
|
Final | 9/17/2010 | 9/20/2010 | 9/20/2010 | A | FAIL |
Bill VanDegrift
|
|
|
Adam Phone #: ###-#### secure lav cabinet. use approved P-trap, no flex tail piece. shutoff valve - full port- required on the cold water to the water heater. pipe water heater T&P drain to garage floor or exterior. use approved material, no PVC, USE cpvc, galv. copper.
|