Final | 12/28/2010 | 12/29/2010 | 12/29/2010 | A | PASS |
Bill VanDegrift
|
|
|
JOB CONTACT IS JOSH MORRIS Phone #: ###-#### >> Inspection requested via web by ADAM WARR
|
Final | 12/22/2010 | 12/23/2010 | 12/23/2010 | A | PART |
Daryl Spivey
|
|
|
JOB CONTACT IS JOSH MORRIS Phone #: ###-#### >> Inspection requested via web by ADAM WARR 3/4 copperline and 1" cpvc line ok and restroom passed...............need dcva for bld protection tested and certified.............ds
|
Plumbing Rough-in | 11/5/2010 | 11/8/2010 | 11/8/2010 | A | PART |
Bill VanDegrift
|
|
|
JOB CONTACT IS NATE Phone #: ###-#### >> Inspection requested via web by ADAM WARR provide a min. 3/4" branch to servenew restroom addition. existing on the 1/2" provided is 1-eyewash 1-hose bib 1-drinking fountain, new fixtures 1-lav, 1-urinal, and 1- toilet. ok to cover new piping in restroom.
|
Plumbing Rough-in | 11/4/2010 | 11/5/2010 | 11/5/2010 | P | CANC |
Bill VanDegrift
|
|
|
JOB CANTACT IS NATE Phone #: ###-#### >> Inspection requested via web by ADAM WARR
|
Groundwork | 10/4/2010 | 10/5/2010 | 10/5/2010 | A | PASS |
Bill VanDegrift
|
|
|
CONTACT IS JOSH MORRIS ###-#### Phone #: ###-#### >> Inspection requested via web by LENNIE BUSS gw ok
|