Final | 1/25/2011 | 1/25/2011 | 1/25/2011 | A | PASS |
Daryl Spivey
|
|
|
call Ed with any questions ###-#### >> Inspection requested via web by Ed Davis no occ card on site to sign off on............ds
|
Plumbing Rough-in | 12/30/2010 | 12/30/2010 | 12/30/2010 | A | PASS |
Bill VanDegrift
|
|
|
1st floor ri ok
|
Groundwork | 12/22/2010 | 12/22/2010 | 12/22/2010 | A | PASS |
Bill VanDegrift
|
|
|
1st floor gw ok
|
Final | 12/20/2010 | 12/21/2010 | 12/21/2010 | A | PART |
Bill VanDegrift
|
|
|
Final second floor call Cameron with questions ###-#### >> Inspection requested via web by Ed Davis needs open front seat on all toilets and the 3rd floor t&p still needs an air gap
|
Final | 11/29/2010 | 11/30/2010 | 11/30/2010 | A | PART |
Bill VanDegrift
|
|
|
final on 3rd floor rough-in inspection on 2nd floor call Ed with questions ###-#### >> Inspection requested via web by Ed Davis needs airgap on the 3rd floor t&p. 2nd floor ri ok
|
Water and/or Sewer | 11/4/2010 | 11/4/2010 | 11/4/2010 | P | PASS |
Bill VanDegrift
|
|
|
public restrooms on third floor out of elevator to the left Phone #: ###-#### >> Inspection requested via web by Ed Davis 3rd floor ri for ada upgrade ok
|