Final | 7/6/2011 | 7/7/2011 | 7/7/2011 | A | PASS |
Jim Johnson
|
|
|
Robert Phone #: ###-####
|
Plumbing Rough-in | 6/13/2011 | 6/13/2011 | 6/13/2011 | P | PASS |
Jim Johnson
|
|
|
robert Phone #: ###-####
|
Final | 4/15/2011 | 4/15/2011 | 4/15/2011 | P | CANC |
Jim Johnson
|
|
|
robert Phone #: ###-####
|
Plumbing Rough-in | 4/15/2011 | 4/15/2011 | 4/15/2011 | P | PART |
Jim Johnson
|
|
|
rough-in on two sink,s second floor north side test ok ok to cover
|
Final | 3/30/2011 | 3/30/2011 | 3/30/2011 | P | PART |
Bill VanDegrift
|
|
|
robert Phone #: ###-#### rest room and 3 sinks north of it
|
Plumbing Rough-in | 3/8/2011 | 3/9/2011 | 3/9/2011 | P | PASS |
Jim Johnson
|
|
|
robert Phone #: ###-####
|
Plumbing Rough-in | 2/9/2011 | 2/10/2011 | 2/10/2011 | A | PART |
Jim Johnson
|
|
|
Robert Phone #: ###-#### this inspection is for a partial final on four exam sink,s on second floor on west side of building oked temp
|
Plumbing Rough-in | 12/23/2010 | 12/27/2010 | 12/27/2010 | P | PART |
Jim Johnson
|
|
|
russ Phone #: ###-#### inwall rough-in for three sink,s test ok ok to cover
|