Final | 11/4/2011 | 11/7/2011 | 11/7/2011 | A | PASS |
Jim Johnson
|
|
|
Phone #: ###-#### >> Inspection requested via web by Travis Baker
|
PLM-Aging Inspection | 10/28/2011 | 10/28/2011 | 10/28/2011 | | PASS |
Jim Johnson
|
|
|
|
PLM-Aging Inspection | 7/29/2011 | 7/29/2011 | 7/29/2011 | | PART |
Jim Johnson
|
|
|
no request for final
|
Final | 4/29/2011 | 4/29/2011 | 4/29/2011 | A | PART |
Jim Johnson
|
|
|
as per cross conection control manual 6th edition and upc 2003 . after walk through with united water purveyor and plumbing contractor. additional backflow protection will be required on the following items. 1. RP on ice cream machine,s 2. RP on cooling water to condensing unit for walk-in cooler 3.RP on swamp cooler,s or an approved air gap 4. RPon chemical dispencer or approved air gap,s note need seperate water supply to chemical dispencer. 5. need double check installed on coffee machine 6.RP on cooling water to ice machine 7. note all water filter,s to be installed down stream of all backflow devices new or existing, items need to be done prior to final on remodel contractor to call when ready
|
Final | 4/21/2011 | 4/21/2011 | 4/21/2011 | P | PART |
Jim Johnson
|
|
|
Phone #: ###-#### >> Inspection requested via web by Travis Baker need to make walk through with Bill T. with united water may need additional backflow devices
|
PLM-Aging Inspection | 3/28/2011 | 3/28/2011 | 3/28/2011 | | PASS |
Jim Johnson
|
|
|
no request for final
|
Groundwork | 1/20/2011 | 1/24/2011 | 1/24/2011 | A | PASS |
Jim Johnson
|
|
|
Phone #: ###-#### >> Inspection requested via web by Travis Baker ground work and rough-in test ok ok to cover
|