Water and/or Sewer | 3/8/2011 | 3/9/2011 | 3/9/2011 | A | CANC |
Jim Johnson
|
|
|
Other contractors should be there, if not call me for the lock box code. Thanks. Phone #: ###-#### >> Inspection requested via web by Josh Johnson
|
Final | 3/9/2011 | 3/9/2011 | 3/9/2011 | A | PASS |
Jim Johnson
|
|
|
|
Plumbing Rough-in | 1/24/2011 | 1/24/2011 | 1/24/2011 | P | PASS |
Jim Johnson
|
|
|
Just need to show you the fiberglass shower and clotheswasher box before the drywall goes in. Phone #: ###-#### >> Inspection requested via web by Josh Johnson
|