Final | 3/3/2011 | 3/3/2011 | 3/3/2011 | P | PASS |
Daryl Spivey
|
|
|
|
Final | 2/28/2011 | 2/28/2011 | 2/28/2011 | P | PART |
Daryl Spivey
|
|
|
if questions call Blair @ ###-#### Phone #: ###-#### >> Inspection requested via web by Sonja Hankel still need washer pump gpm and gpm's going into ejector and ejector's output..........ds
|
Final | 2/14/2011 | 2/16/2011 | 2/16/2011 | P | PART |
Lee Rice
|
|
|
called Blair, He is gathering requested information for Daryl
|
Final | 2/11/2011 | 2/14/2011 | 2/14/2011 | A | FAIL |
Daryl Spivey
|
|
|
If questions call Blair @ ###-#### Phone #: ###-#### >> Inspection requested via web by Sonja Hankel met with Lee and need installation manual for G/I, ejector gpm pump data and D/W gpm on pump to properly size ejector pump and it needs to be vented to the outside.........AAV not allowed.............ds
|