Final | 5/23/2011 | 5/23/2011 | 5/23/2011 | A | PASS |
Jim Johnson
|
|
|
Phone #: ###-#### >> Inspection requested via web by Jason Gale
|
Plumbing Rough-in | 4/11/2011 | 4/12/2011 | 4/12/2011 | A | PASS |
Jim Johnson
|
|
|
Jim, Line for shower head is tented if you would like to see it. You gave a partial and wanted to see it tented after fire sprinklers were installed. Phone #: ###-#### >> Inspection requested via web by Jason Gale
|
Plumbing Rough-in | 3/30/2011 | 3/30/2011 | 3/30/2011 | A | PART |
Bill VanDegrift
|
|
|
Jim please call me ###-#### Thx Jason Phone #: ###-#### >> Inspection requested via web by Jason Gale ri ok still needs tenting will tent with fire system and recall
|
Plumbing Rough-in | 3/28/2011 | 3/29/2011 | 3/29/2011 | P | FAIL |
Jim Johnson
|
|
|
Should be ready about 11 A.M. Phone #: ###-#### >> Inspection requested via web by Jason Gale need to provide tenting over water piping to over head shower. as per table 7-5 2003 upc no more than 1/3 of the total permitted length of any vent may be installed in a horizontal position 1 1/2 vent in overhead is too long
|