Final | 6/13/2011 | 6/14/2011 | 6/14/2011 | A | PASS |
Jim Johnson
|
|
|
Dennis-After 8:30 please Phone #: ###-####
|
Final | 6/9/2011 | 6/9/2011 | 6/9/2011 | P | FAIL |
Jim Johnson
|
|
|
Dennis Phone #: ###-#### need main water supply to building tested and certified need 120 degree hot water limitation on laves in rest room,s need to caulk drinking fountain and urinal to wall need to correct leak on hot water side on faucet in men,s rest room contractor to recall when ready
|
Plumbing Rough-in | 4/26/2011 | 4/27/2011 | 4/27/2011 | A | PASS |
Jim Johnson
|
|
|
|
Plumbing Rough-in | 4/26/2011 | 4/26/2011 | 4/26/2011 | P | PART |
Jim Johnson
|
|
|
PAUL PLEASE CALL 30 MIN BEFORE GOING OUT Phone #: ###-#### water test ok need to repipe venting for drinking fountain, mop sink, and water closet,s talked to contractor on site on venting
|