Water and/or Sewer | 5/24/2011 | 5/24/2011 | 5/24/2011 | A | CANC |
Jim Johnson
|
|
|
The owner wants to have the work that we have done finaled for Temporary Occupancy . We are still working out other detials of the Job, the owner wants to get the final work approved by the inspector. Please leave this permit open for additional add on to scope of work. Phone #: ###-#### >> Inspection requested via web by Joseph Corcoran
|
Final | 5/24/2011 | 5/24/2011 | 5/24/2011 | A | PASS |
Jim Johnson
|
|
|
|
Water and/or Sewer | 5/19/2011 | 5/19/2011 | 5/19/2011 | P | CANC |
Jim Johnson
|
|
|
RPZ Testing is complete and will need to get the final inspection done on the plumbing system. The Pop machines are not installed as of yet, However the Coca Cola Guys will be out to install after inspection is complete on our end. Phone #: ###-#### >> Inspection requested via web by Joseph Corcoran canc talked with joe need to have sode machine,s installed prior to final contractor will call when ready
|
Water and/or Sewer | 5/9/2011 | 5/10/2011 | 5/10/2011 | P | NR |
Jim Johnson
|
|
|
Please call before inspection to make sure someone will be there and have it opened up for inspection. Phone #: ###-#### >> Inspection requested via web by Joseph Corcoran not ready for final
|
Plumbing Rough-in | 5/4/2011 | 5/4/2011 | 5/4/2011 | P | PASS |
Jim Johnson
|
|
|
groundwork and rough-in test ok ok to cover
|
Water and/or Sewer | 5/4/2011 | 5/4/2011 | 5/4/2011 | A | NR |
Jim Johnson
|
|
|
Rough in inspection for the old wendys off of fairview, next to mexican resturant. Please call before to make sure someone is there. Thanks Phone #: ###-#### >> Inspection requested via web by Joseph Corcoran not ready
|