Final | 8/9/2011 | 8/10/2011 | 8/10/2011 | P | PASS |
Bill VanDegrift
|
|
|
JOB CONTACT IS JAY. PLEASE CALL FIRST FOR ACCESS TO BUILDING Phone #: ###-#### >> Inspection requested via web by ADAM WARR
|
Final | 8/5/2011 | 8/5/2011 | 8/5/2011 | P | PART |
Eric Strole
|
|
|
JOB CONTACT IS NATE Phone #: ###-#### >> Inspection requested via web by ADAM WARR-spray hoses on faucets need to retract on there own.
|
Final | 7/11/2011 | 7/11/2011 | 7/11/2011 | P | PART |
Eric Strole
|
|
|
JOB CONTACT IS NATE ###-#### Phone #: ###-#### >> Inspection requested via web by MARGGIE BUSS-partial final, ok to move equipment in only.
|
Plumbing Rough-in | 5/12/2011 | 5/13/2011 | 5/13/2011 | A | PART |
Daryl Spivey
|
|
|
Waste and vent tested ok.........ds
|
Plumbing Rough-in | 5/12/2011 | 5/12/2011 | 5/12/2011 | P | PART |
Bill VanDegrift
|
|
|
water test on
|
Plumbing Rough-in | 5/10/2011 | 5/11/2011 | 5/11/2011 | A | PART |
Bill VanDegrift
|
|
|
JOB CONTACT IS NATE ###-#### Phone #: ###-#### >> Inspection requested via web by MARGGIE BUSS conference,, basement drainage for equipment must be piped to indirect waste receptor with sealed and vented sump. remove R.P. in the crawl space. floor sinks under treatment sinks must not be enclosed in cabinets. DCVA required on sprinkler in bottle storage room.
|