Final | 7/5/2011 | 7/6/2011 | 7/6/2011 | A | PASS |
Eric Strole
|
|
|
COMMERCIAL TI Phone #: ###-#### >> Inspection requested via web by Chris Field
|
Final | 7/1/2011 | 7/5/2011 | 7/5/2011 | A | PART |
Eric Strole
|
|
|
COMMERCIAL TI Phone #: ###-#### >> Inspection requested via web by Chris Field-rpba needs to be upstream of RO system, need dbca on ice machine up stream of filter and rpba on hot water dispensor
|
Plumbing Rough-in | 6/30/2011 | 6/30/2011 | 6/30/2011 | P | PEND |
Eric Strole
|
|
|
rough-in looks ok, permitting issues
|
Final | 6/30/2011 | 6/30/2011 | 6/30/2011 | P | CANC |
Eric Strole
|
|
|
Commercial Taco Bell TI at truck stop: install hand wash sink & faucet, install backflow assembly and install owner''s RO system for steamer. Phone #: ###-#### >> Inspection requested via web by Chris Field
|
Final | 6/29/2011 | 6/30/2011 | 6/30/2011 | A | CANC |
Eric Strole
|
|
|
Commercial TI at Taco Bell in truck stop: Hand wash sink, backflow device, & owner''s R.O. system. Phone #: ###-#### >> Inspection requested via web by Chris Field Inspection cancelled from web by: Chris Field
|