Final | 12/9/2011 | 12/9/2011 | 12/9/2011 | P | PASS |
Eric Strole
|
|
|
Brandon Phone #: ###-####
|
Plumbing Rough-in | 9/6/2011 | 9/6/2011 | 9/6/2011 | P | PASS |
Eric Strole
|
|
|
Brandon Phone #: ###-####
|
Plumbing Rough-in | 9/2/2011 | 9/2/2011 | 9/2/2011 | P | FAIL |
Eric Strole
|
|
|
brandon Phone #: ###-####-water lines in attic space need to be tented, water lines in exteriour walls need 3 1/2' for insulation, upstairs shower needs to be plumbed with approved fittings & vent needs to be downstream of trap, upstairs tub drain needs to be downstream of toilet vent.
|
Groundwork | 8/11/2011 | 8/11/2011 | 8/11/2011 | P | PASS |
Eric Strole
|
|
|
branden Phone #: ###-####
|