Sprinkler (Final) | 8/29/2011 | 8/30/2011 | 8/30/2011 | A | PASS |
Jim Johnson
|
|
|
robert Phone #: ###-####
|
Plumbing Rough-in | 8/25/2011 | 8/26/2011 | 8/26/2011 | A | FAIL |
Jim Johnson
|
|
|
robert Phone #: ###-#### need to remove stop and waste valve and replace with approved stop and drain valves need to raise P V B 12 inches above highest floodable head need to provide blow out tee downstream of backflow called contractor will recall when ready
|
Water and/or Sewer | 8/22/2011 | 8/23/2011 | 8/23/2011 | A | PART |
Jim Johnson
|
|
|
Robert-water line only Phone #: ###-#### water line test ok ok to cover need to add sprinkler backflow to permit and update system contractor to call when ready
|
Water and/or Sewer | 8/18/2011 | 8/19/2011 | 8/19/2011 | P | NR |
Jim Johnson
|
|
|
robert Phone #: ###-#### not ready contractor to recall when ready
|