Final | 12/23/2011 | 12/27/2011 | 12/27/2011 | A | PASS |
Jim Johnson
|
|
|
Robere Phone #: ###-####
|
Other | 11/28/2011 | 11/28/2011 | 11/28/2011 | A | PART |
Bill VanDegrift
|
|
|
met builder on the job to go over the drinking fountain requirement and location on the plans.
|
Final | 11/17/2011 | 11/17/2011 | 11/17/2011 | P | FAIL |
Bill VanDegrift
|
|
|
Scott Phone #: ###-#### tempering valves required on lavs, pipe t&p line to floor sink. provide required drinking fountain.
|
Final | 11/15/2011 | 11/15/2011 | 11/15/2011 | P | CANC |
Jim Johnson
|
|
|
call for access info//Scott Phone #: ###-#### canc by contractor will recall when ready
|
Plumbing Rough-in | 10/19/2011 | 10/20/2011 | 10/20/2011 | P | PASS |
Daryl Spivey
|
|
|
scott ###-####
|
Plumbing Rough-in | 10/19/2011 | 10/19/2011 | 10/19/2011 | A | PART |
Daryl Spivey
|
|
|
partial...........need to rough in for a dcva for building protection....ok to bury ground work and W & V are ok...........ds
|
Water and/or Sewer | 10/18/2011 | 10/19/2011 | 10/19/2011 | A | PASS |
Daryl Spivey
|
|
|
Scott-access from Freemont -call for access information Phone #: ###-#### ALSO need Groundwork inspection and ROUGH IN inspection please--email inspection results to spp7248392@gamil.com please--THANKS water service ok to bury................ds
|