Other | 2/13/2012 | 2/14/2012 | 2/14/2012 | A | PART |
Bill VanDegrift
|
|
|
9:00 am sharp walk through with Eric
|
Final | 2/13/2012 | 2/14/2012 | 2/14/2012 | A | PASS |
Eric Strole
|
|
|
9:00 am
|
Final | 2/9/2012 | 2/13/2012 | 2/13/2012 | A | PART |
Eric Strole
|
|
|
10:00 am-Test on IW line pass, need to finish venting of IW line. Temp final ok.
|
Final | 2/8/2012 | 2/9/2012 | 2/9/2012 | P | PART |
Eric Strole
|
|
|
1:30 pm-Need to use mission coupling from pvc to cast iron at flr sinks and retest. Need to finish all labeling.
|
Final | 2/6/2012 | 2/6/2012 | 2/6/2012 | P | PART |
Eric Strole
|
|
|
victor Phone #: ###-####-need to test IW and finish venting.
|
Other | 12/29/2011 | 12/29/2011 | 12/29/2011 | P | PART |
Eric Strole
|
|
|
victor - gravity drains inspection Phone #: ###-####-vents for industrial waste, di reclaim and hydro floric lines and colum 14 waste test pass
|
Other | 12/15/2011 | 12/15/2011 | 12/15/2011 | P | PART |
Eric Strole
|
|
|
victor - gravity to drains Phone #: ###-####-test on colum line 4-7-10 industrial waste, di reclaim and hydro floric pass.
|