PLM-Aging Inspection | 7/4/2012 | 7/4/2012 | 7/9/2012 | | PASS |
Daryl Spivey
|
|
|
|
DOC - Permit Finaled | 7/9/2012 | 7/9/2012 | 7/9/2012 | P | PASS |
Daryl Spivey
|
|
|
The shell and core is completed........ds
|
Roof Drains | 4/4/2012 | 4/4/2012 | 4/4/2012 | P | PASS |
Daryl Spivey
|
|
|
|
Plumbing Rough-in | 4/3/2012 | 4/4/2012 | 4/4/2012 | A | CANC |
Daryl Spivey
|
|
|
RAIN DRAINS. if questions call Josh @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann
|
Groundwork | 3/7/2012 | 3/8/2012 | 3/8/2012 | A | PART |
Daryl Spivey
|
|
|
if questions call Josh @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumanarea drain in trash enclosure and trench drain in loading dock. ok...........ds
|
Groundwork | 2/28/2012 | 2/29/2012 | 2/29/2012 | A | PART |
Daryl Spivey
|
|
|
if questions call Josh @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann fire sprinkler drain in loading dock area tested.............ds
|
Groundwork | 2/9/2012 | 2/10/2012 | 2/10/2012 | A | PART |
Daryl Spivey
|
|
|
if questions call Josh @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann 24 hr test on grease int. tested ok and 8 in. roof drain ground leader in se corner tested.........ds
|
Groundwork | 2/6/2012 | 2/7/2012 | 2/7/2012 | A | PART |
Daryl Spivey
|
|
|
if questions call Josh ###-####. Phone #: ###-#### >> Inspection requested via web by Stacia Haumann sewer and grease lines by interceptor tested ok.........ds
|