Final | 5/2/2013 | 5/3/2013 | 5/3/2013 | P | PASS |
Daryl Spivey
|
|
|
|
Final | 5/1/2013 | 5/2/2013 | 5/2/2013 | A | PART |
Eric Strole
|
|
|
St Vincent final plumbing inspection. Please contact Denny Wilkin ###-#### before going out. Phone #: ###-#### >> Inspection requested via web by Rusty Karel-need open front seats and T&P needs a 1" air gap
|
PLM-Aging Inspection | 3/8/2013 | 3/8/2013 | 3/8/2013 | | PASS |
Bill VanDegrift
|
|
|
should be close to being done
|
PLM-Aging Inspection | 12/7/2012 | 12/7/2012 | 12/7/2012 | | PART |
Eric Strole
|
|
|
wip
|
PLM-Aging Inspection | 9/7/2012 | 9/7/2012 | 9/7/2012 | | PART |
Eric Strole
|
|
|
wip
|
Other | 6/8/2012 | 6/8/2012 | 6/8/2012 | P | PASS |
Eric Strole
|
|
|
pressure test-60 lb gas test pass
|
Other | 6/7/2012 | 6/8/2012 | 6/8/2012 | A | FAIL |
Eric Strole
|
|
|
luke ( for gas line pressure test) Phone #: ###-####-gage did not 0 out. change gage and retest.
|
Plumbing Rough-in | 5/8/2012 | 5/9/2012 | 5/9/2012 | A | PASS |
Bill VanDegrift
|
|
|
Call prior to going Phone #: 2088708327 >> Inspection requested via mobile web by Luke ri ok just needs the water service upgraded and the venting for the prep sink in the existing part of the building through the roof.
|
Other | 5/7/2012 | 5/8/2012 | 5/8/2012 | A | CANC |
Eric Strole
|
|
|
|
Plumbing Rough-in | 4/20/2012 | 4/20/2012 | 4/20/2012 | P | FAIL |
Eric Strole
|
|
|
Drain, waste, vent and water supply rough-in inspection. Phone #: ###-#### >> Inspection requested via web by Rusty Karel-early start permit allows in ground plumbing only. no other plumbing allowed to be installed or inspected till building permit that is under review is issued.
|
Groundwork | 3/27/2012 | 3/27/2012 | 3/27/2012 | A | PASS |
Eric Strole
|
|
|
Ground work inside the building is complete. Phone #: ###-#### >> Inspection requested via web by Rusty Karel
|
Water and/or Sewer | 3/22/2012 | 3/23/2012 | 3/23/2012 | P | PART |
Eric Strole
|
|
|
test on grease interceptor pass, outside piping upstream and downstream of interceptor pass.
|
Groundwork | 3/21/2012 | 3/22/2012 | 3/22/2012 | A | PART |
Eric Strole
|
|
|
Ground work for the new bathroom group, kitchen and grease interceptor. Phone #: ###-#### >> Inspection requested via web by Rusty Karel,-(start of 24 hr test on grease interceptor) prep sink and dishwasher need to be indirect, Need to vent flr sink in kitchen area, need to run 4" dvw in slab over to drinking fountain area or have changed from approved plans, need to bed all piping in slab, need to finish all ground work and test. Need to permit grease interceptor .
|