Final | 5/9/2012 | 5/9/2012 | 5/9/2012 | P | PASS |
Jim Johnson
|
|
|
Jim the Backflow will be inspected by 1:00 thanks rob Phone #: ###-#### >> Inspection requested via web by robert goodson
|
Final | 5/8/2012 | 5/9/2012 | 5/9/2012 | A | PART |
Jim Johnson
|
|
|
it will be open all day. thanks jim Phone #: ###-#### >> Inspection requested via web by robert goodson need premius protection double check tested and certified and expansion tank installed on water heater contractor to recall when ready
|
Plumbing Rough-in | 4/26/2012 | 4/27/2012 | 4/27/2012 | A | PASS |
Jim Johnson
|
|
|
good morning jim i will be here in the about 830 i just have to fill the drains up. the building will be open all day come when every you have time thanks rob Phone #: ###-#### >> Inspection requested via web by robert goodson
|
Groundwork | 4/12/2012 | 4/13/2012 | 4/13/2012 | A | PASS |
Jim Johnson
|
|
|
I will be there at 8 am i just need to pump it up we need to use the back door you can call me when your close thanks rob Phone #: ###-#### >> Inspection requested via web by robert goodson
|