Final | 8/16/2012 | 8/16/2012 | 8/16/2012 | A | PASS |
Jim Johnson
|
|
|
The 1.5" RP backflow has been confirmed that it feeds the entire hot and cold water of the Dentist office side. The 2" DCBA, the 1/2" RP and the 1.5" RP have been tested and passed. Please complete final. Phone #: ###-#### >> Inspection requested via web by Scott Sparrell
|
Final | 8/14/2012 | 8/15/2012 | 8/15/2012 | A | PART |
Jim Johnson
|
|
|
meet with plumbing contractor and united water
|
Final | 8/10/2012 | 8/13/2012 | 8/13/2012 | A | PEND |
Jim Johnson
|
|
|
Jim, you need to call thompson for walk thru made walk through with Bill Thompson with united water unable to find premius protection need to reschedule walk through with plumbing contractor and united water.
|
Final | 8/10/2012 | 8/10/2012 | 8/10/2012 | A | PEND |
Eric Strole
|
|
|
Jim needs a walk thru with bill thompson.
|
Final | 8/10/2012 | 8/10/2012 | 8/10/2012 | A | CANC |
Eric Strole
|
|
|
Final plumbing inspection. All trim except the utility sink in X-Ray room are set. Awaiting delivery of sink from owner. Thank you! Scott. ####-#### Phone #: ###-#### >> Inspection requested via web by Scott Sparrell
|
Plumbing Rough-in | 6/10/2012 | 6/11/2012 | 6/11/2012 | A | PASS |
Daryl Spivey
|
|
|
TI rough in to include water, waste and vent piping. It will be under test by 9am. Call Scott for access. ####-#### Phone #: ###-#### >> Inspection requested via web by Scott Sparrell
|
Groundwork | 5/19/2012 | 5/21/2012 | 5/21/2012 | A | PASS |
Jim Johnson
|
|
|
Groundwork inspection for 3 bathrooms, breakroom, and mechanical room. Scott is on site for inspection. Phone #: ###-#### >> Inspection requested via web by Scott Sparrell
|