Sprinkler (Final) | 8/20/2012 | 8/20/2012 | 8/20/2012 | P | PASS |
Jim Johnson
|
|
|
Tyson Phone #: ###-####
|
Sprinkler (Final) | 8/15/2012 | 8/16/2012 | 8/16/2012 | A | PART |
Jim Johnson
|
|
|
tie in ok need to have backflow,s tested and certified for final called contractor
|
Sprinkler (Final) | 8/10/2012 | 8/13/2012 | 8/13/2012 | A | FAIL |
Jim Johnson
|
|
|
Dennis Phone #: ###-#### need to complete correction,s on correction notice issued 8/9/12 called contractor left message to call me
|