PLM-Aging Inspection | 8/29/2013 | 8/29/2013 | 8/29/2013 | | PASS |
Bill VanDegrift
|
|
|
|
Final | 8/29/2013 | 8/29/2013 | 8/29/2013 | A | PASS |
Bill VanDegrift
|
|
|
rp installed and tested
|
Water and/or Sewer | 5/30/2013 | 6/3/2013 | 6/3/2013 | A | PASS |
Eric Strole
|
|
|
It will be tested and ready. thanks. Phone #: ###-#### >> Inspection requested via web by Clyde Lingo
|
PLM-Aging Inspection | 5/30/2013 | 5/30/2013 | 5/30/2013 | | PEND |
Eric Strole
|
|
|
contractor will call for final
|
PLM-Aging Inspection | 2/28/2013 | 2/28/2013 | 2/28/2013 | | PART |
Eric Strole
|
|
|
no calls
|
Water and/or Sewer | 11/13/2012 | 11/14/2012 | 11/14/2012 | P | PART |
Eric Strole
|
|
|
Please contact Chad onsite at ###-#### with questions. thanks Phone #: ###-#### >> Inspection requested via web by Clyde Lingo-per bill thompson with united water dbca at drainage swall needs to be changed to a rpba, other dbca needs tested and certified, waiting for meter.
|