PLM-Aging Inspection | 3/15/2013 | 3/15/2013 | 3/15/2013 | | PASS |
Jim Johnson
|
|
|
|
DOC - Permit Finaled | 3/15/2013 | 3/15/2013 | 3/15/2013 | P | PASS |
Jim Johnson
|
|
|
|
Water and/or Sewer | 12/14/2012 | 12/14/2012 | 12/14/2012 | P | PART |
Jim Johnson
|
|
|
6 inch storm drain test ok
|
Water and/or Sewer | 11/13/2012 | 11/14/2012 | 11/15/2012 | A | PART |
Jim Johnson
|
|
|
tank full of water sewer line test ok still need to test 6 inch storm drain line contractor to recall when ready
|
Water and/or Sewer | 11/9/2012 | 11/13/2012 | 11/13/2012 | A | CANC |
Jim Johnson
|
|
|
Project location is at the main emergency room ambulance drive thru. Please call John Badiola w/Lurre @ ###-#### if you have any questions. Phone #: ###-#### >> Inspection requested via web by Kris Jensen
|