Final | 1/18/2013 | 1/22/2013 | 1/22/2013 | A | PASS |
Jim Johnson
|
|
|
Phone #: ###-#### >> Inspection requested via web by Travis Baker
|
Plumbing Rough-in | 12/24/2012 | 12/24/2012 | 12/24/2012 | P | PASS |
Jim Johnson
|
|
|
Call Travis @ ###-#### to gain access to the bld >> Inspection requested via web by Travis Baker
|
Plumbing Rough-in | 12/21/2012 | 12/21/2012 | 12/21/2012 | P | PART |
Jim Johnson
|
|
|
Downstairs bathroom is ready for rough-in inspection Phone #: ###-#### >> Inspection requested via web by Travis Baker need to increase water line to 1 1/4 to new restroom talked to contractor on site will recall when ready note DWV test ok
|
Plumbing Rough-in | 12/14/2012 | 12/14/2012 | 12/14/2012 | P | PART |
Jim Johnson
|
|
|
Ready for inspection any time after 3:00. Partial rough-in inspection for second floor bathroom and break room. Phone #: ###-#### >> Inspection requested via web by Travis Baker second floor restroom,s and break room rough-in test ok ok to cover
|
Groundwork | 12/10/2012 | 12/11/2012 | 12/11/2012 | A | PASS |
Jim Johnson
|
|
|
Phone #: ###-#### >> Inspection requested via web by Travis Baker
|