Final | 3/5/2013 | 3/7/2013 | 3/7/2013 | P | PASS |
Jim Johnson
|
|
|
Please go after 130pm. Call Blythe before you go at ###-#### Phone #: ###-#### >> Inspection requested via web by Echo Jackson
|
Final | 1/28/2013 | 1/29/2013 | 1/29/2013 | P | FAIL |
Jim Johnson
|
|
|
Final inspection scheduled for 1/29/13pm,. Please come after 130pm if you can, and call Blythe on your way at ###-####. (We also have mechanical final scheduled today, MEC13-00076) Phone #: ###-#### >> Inspection requested via web by Echo Jackson need to repipe softner drain to an approved location need to support pex piping as per upc table 3-2 correction need to done by licensed plumbing contractor as per conversation with Allen
|
Final | 1/17/2013 | 1/18/2013 | 1/18/2013 | P | FAIL |
Jim Johnson
|
|
|
final inspection scheduled for 1/18/13pm. Please go at 130pm or after, if possible. Call Blythe before you go at ###-#### Phone #: ###-#### >> Inspection requested via web by Echo Jackson need to install shut off valve on hard water line to softner called contractor will recall when ready
|