Final | 2/8/2013 | 2/8/2013 | 2/8/2013 | A | PASS |
Jim Johnson
|
|
|
mait Phone #: ###-#### >> Inspection requested via web by j mait downer jr
|
Final | 2/7/2013 | 2/7/2013 | 2/7/2013 | A | FAIL |
Jim Johnson
|
|
|
mait Phone #: ###-#### >> Inspection requested via web by j mait downer jr need 120 degree hot water limitation for lav as per upc 413.1 contractor to recall when ready
|
Plumbing Rough-in | 1/30/2013 | 1/31/2013 | 1/31/2013 | A | PASS |
Bill VanDegrift
|
|
|
please call befor going in Phone #: ###-#### >> Inspection requested via web by j mait downer jr lav ri ok will need to veerify dcva testing and toilet handle is on right side at final.
|