Final | 5/28/2013 | 5/28/2013 | 5/28/2013 | P | PASS |
Jim Johnson
|
|
|
JOB CONTACT IS JIMMY Phone #: ###-#### >> Inspection requested via web by ADAM WARR
|
Final | 5/22/2013 | 5/23/2013 | 5/23/2013 | A | PART |
Jim Johnson
|
|
|
JOB CONTACT - JIMMY ###-#### Phone #: ###-#### >> Inspection requested via web by BECCA DUMMER need to have premius protection double check tested and certified for final need to protect eye wash by mop sink with a spill proof P V B or shorten hose to provide a one inch air gap above mop sink flood level rim called contractor will recall when ready
|
Plumbing Rough-in | 4/15/2013 | 4/15/2013 | 4/15/2013 | P | PASS |
Jim Johnson
|
|
|
JOB CONTACT IS JOHN WELSH Phone #: ###-#### >> Inspection requested via web by ADAM WARR roof and overflow drain,s test ok
|
Plumbing Rough-in | 4/12/2013 | 4/12/2013 | 4/12/2013 | P | PART |
Jim Johnson
|
|
|
contact is Mark ###-#### Phone #: ###-#### >> Inspection requested via web by LENNIE BUSS plumbing rough-in test ok ok to cover need to have roof and overflow drains tested contractor to recall when ready
|
Plumbing Rough-in | 4/11/2013 | 4/12/2013 | 4/12/2013 | A | FAIL |
Jim Johnson
|
|
|
JOB CONTACT - JIMMY ###-#### Phone #: ###-#### >> Inspection requested via web by BECCA DUMMER test failed on D W V need to retest contractor to recall when ready
|
Groundwork | 2/26/2013 | 2/27/2013 | 2/27/2013 | A | PASS |
Jim Johnson
|
|
|
contact is Jimmy ###-#### Phone #: ###-#### >> Inspection requested via web by LENNIE BUSS
|