Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberPLM13-00337
StatusFinaled
Name PAIGE MECHANICAL GROUP INC
Site Address 2513 S FEDERAL WAY
Project NameCreate Common Good
Customer Number 
ePlanReviewNo
Description
Plumbing Permit - Alteration: DWV, Water, Fixtures
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final5/2/20135/3/20135/3/2013APASS
DetailsDaryl Spivey
please call Jeremy with any questions or thayne @###-#### Phone #: ###-#### >> Inspection requested via web by Nicholas Paige
Final5/2/20135/3/20135/2/2013PCANC
DetailsEric Strole
please call thayne with any questions Phone #: ###-#### >> Inspection requested via web by Nicholas Paige Inspection cancelled from web by: Nicholas Paige
Final4/29/20134/30/20134/30/2013AFAIL
DetailsBill VanDegrift
please call thayne with any questions Phone #: ###-#### >> Inspection requested via web by Nicholas Paige no corrections made. added note to existing correction notice. talked to Thane about checking premise isolation for testing.
Other4/29/20134/29/20134/29/2013PDONE
DetailsEric Strole
This was a conferance on backflows required.Pot filler needs a dbca and water to make-up air requires a rpba.
Water and/or Sewer3/15/20133/18/20133/18/2013APASS
DetailsEric Strole
test on interceptor pass.
Water and/or Sewer3/15/20133/15/20133/15/2013PPART
DetailsEric Strole
start of 24 hr test on interceptor
Water and/or Sewer3/15/20133/15/20133/15/2013AFAIL
DetailsEric Strole
Interceptor still leaking.
Water and/or Sewer3/13/20133/14/20133/14/2013ACANC
DetailsEric Strole
There is a stop work on site till ESC permit is issued.
Groundwork3/13/20133/13/20133/13/2013PCANC
DetailsEric Strole
this is to inspect the greace interceptor. Call thayne with any questions Phone #: ###-#### >> Inspection requested via web by Nicholas Paige
Other3/12/20133/13/20133/13/2013PCANC
DetailsEric Strole
Water and/or Sewer3/12/20133/12/20133/12/2013PFAIL
DetailsEric Strole
Test on grease interceptor fail.
Plumbing Rough-in3/11/20133/11/20133/11/2013PPASS
DetailsEric Strole
please call thayne with any questions Phone #: ###-#### >> Inspection requested via web by Nicholas Paige
Groundwork2/22/20132/25/20132/25/2013APART
DetailsEric Strole
ground work ok to cover, may add hub drain for cooler, need to install grease interceptor.
Groundwork2/21/20132/22/20132/22/2013ANR
DetailsEric Strole
Call thayne hill with any questions Phone #: ###-#### >> Inspection requested via web by Nicholas Paige