Final | 2/20/2015 | 2/20/2015 | 2/20/2015 | P | PASS |
Eric Strole
|
|
|
Josh Phone #: ###-####
|
Final | 2/17/2015 | 2/17/2015 | 2/17/2015 | P | PART |
Eric Strole
|
|
|
Josh Phone #: ###-####-Need to install a RPBA on make-up water to boiler.
|
Final | 2/17/2015 | 2/18/2015 | 2/17/2015 | A | CANC |
Eric Strole
|
|
|
|
PLM-Aging Inspection | 12/29/2014 | 12/29/2014 | 12/29/2014 | | PASS |
Bill VanDegrift
|
|
|
talked to Josh, should be about ready to final in two months.
|
PLM-Aging Inspection | 9/29/2014 | 9/29/2014 | 9/29/2014 | | PART |
Eric Strole
|
|
|
no calls
|
PLM-Aging Inspection | 6/30/2014 | 6/30/2014 | 6/30/2014 | | PART |
Eric Strole
|
|
|
NO CALLS
|
PLM-Aging Inspection | 3/31/2014 | 3/31/2014 | 3/31/2014 | | PART |
Eric Strole
|
|
|
wip
|
Plumbing Rough-in | 12/30/2013 | 12/30/2013 | 12/30/2013 | P | PASS |
Eric Strole
|
|
|
josh - pre-con hvac Phone #: ###-####
|
Plumbing Rough-in | 12/11/2013 | 12/12/2013 | 12/12/2013 | P | PART |
Eric Strole
|
|
|
josh Phone #: ###-####-Need to vent kitchen and toilet per the 2009 ispc and tent overhead water.
|
PLM-Aging Inspection | 11/6/2013 | 11/6/2013 | 11/6/2013 | | PART |
Eric Strole
|
|
|
wip
|
PLM-Aging Inspection | 8/7/2013 | 8/7/2013 | 8/7/2013 | | PART |
Eric Strole
|
|
|
wip
|
Plumbing Rough-in | 4/25/2013 | 4/26/2013 | 4/26/2013 | A | PART |
Eric Strole
|
|
|
joshua Phone #: ###-####-100 psi test on radiant heat loops in slab pass.
|
Groundwork | 4/22/2013 | 4/22/2013 | 4/22/2013 | A | PASS |
Eric Strole
|
|
|
|
Other | 4/16/2013 | 4/19/2013 | 4/19/2013 | P | DONE |
Eric Strole
|
|
|
conference//Josh Phone #: ###-####
|